Okay... Sounds easy enough. The metal is already fairly smooth so I will start with the 240 greaseless. Any idea how long this should take (for each step)? Also, is there anything special I should know? I'm only doing the exposed part of the frame (everything else is being done elsewhere). Below is a picture. Thanks!