This is just an overview of my line. It may not be the prettiest thing I've ever built but it is effective and was relatively economical. I won't get into costs, though it may be more than some of the typical backyarder's are willing to go into hock for - I don't blame you. Having said that, it wasn't 10's of 1000's of dollars either.
Future upgrades are to include :
- New constant current power supply (probably 150 amp neighbourhood)
- Larger coolant reservoir
- Overhead crane and trolly system (lifting racks is a pain!)
- Automated temperature control on all tanks via PLC
- Digital timers on each tank.
Thanks for checking out my setup. If any of you have question, I'll be happy to address them. I apologize if some of the pictures are a little unclear - I'm not much of a photographer.
- Dan
P.S. I was sort of in a rush with people in and out of the building all day when I made this thread that I probably forgot to include a bunch of stuff...If later on down the road I realize I did just that, I'll update it.