I got the frame all welded up tonight , just need to ad a few more braces in the bottom ,one on each side and the back. and ad a heavy duty one in middle on the top to hang parts (cycle frames) from.
also got the door frame done. I did the door with 1''x2'' box tubing.
calling tomorrow to order my sheetmetal .
here's a door frame pic..