I finished the back frame and mocked everything up today. The rivets are killing me on dimensions. I guess I should have added a 1/16th or so to compensate. Oh well, I can shift things and make it work. I'm going to wait on the door untill the oven is completely sheeted and built, then I'll just build the door to fit. Maybe I'll have it covered, at least the inside by this weekend. Anybody have any ideas as far as; Should I sheet each individual section(inside portion) by leaving overhang material to wrap around the ends, then assemble everything? or Should I assemble everything and cut and fit the interior portion sheet metal with no wrap around and just seal the seams and corners?
Any help?
