Default Re: WeTDrEaM Oven Build. Step by Step

Installed the cross braces today every 2' from the bottom up. worked out to be 3 braces per wall. I installed them at the 2' mark because I will be using the 4" Roxul Insulation. The Roxul is R4.3 per inch. This make it the best choice for the 4" wall. Before I installed the cross braces I did install another upright toward the rear where the side and the back walls meet. This upright was installed so the sheet metal has something to be screwed to in the corner. See pics below.