View Single Post
  #20 (permalink)  
Old 12-24-2003, 05:31 PM
tomg552001 tomg552001 is offline
Experienced Metal Finisher
 
Join Date: Dec 2002
Location: NJ
Posts: 290
tomg552001
Send a message via AIM to tomg552001
Default

The building alone cost me $2200 delivered. It's a 25ft wide by 26ft long building with 8ft walls and 13 ft peak. It has a 45 lbs per sq ft snow load and will withstand a 90 mph wind. The end walls will be framed out myself and i can add arches at any time to make the builing longer. I live in the mountains of northern new jersey, so we need the snow load badly, and we also need 36 inch footings since the building is over 500sq ft. This spring the building will go up and i guess i am just thinking to the future with the insulation. It's going to cost a pretty penny for the footings and floor (about 25 yards or so) but it brings the value of the house up greatly, especially in this area. I also have some good friends who do masonry stuff, and are electricians so i can hopefully save a few dollars here and there. I too want to AC my shop, especially for the summers up here, but that's not my main concern right now.
Reply With Quote