Yea i'm doing most of the work on my own aswell. The footings i need to have done by a professional because it has to be poured a certain way for the building to be errected right. I may have them do the floor aswell just so i know i have a level smoothe floor. The wiring i'm going to have a friend do the basic stuff just to pass the safety inspection. From there i'll do the wiring myself. My towns real strict about code so i just need to get past the initial inspection. We are also going to figure out a clever way to get water out there without the town knowing, but we havn't figured that part out yet

.