Plating Powder Coating Buffing Anodizing - Caswell Inc. Metal Finishing Forum  

Go Back   Plating Powder Coating Buffing Anodizing - Caswell Inc. Metal Finishing Forum > Powder Coating Questions > Oven Building Forum

Notices

Oven Building Forum Building A Curing Oven? - Here's the place to post your questions, specs and ideas.

Reply
 
Thread Tools Display Modes
  #1 (permalink)  
Old 09-06-2008, 10:23 PM
Newbie
 
Join Date: Aug 2008
Posts: 7
justshapes is on a distinguished road
Default Wiring schematic - help

I have been told that the Model SYL-4352 PID could activate two SSR's.

I have questions as to the line input to the SSR. Is the L1 a required line input (see attached schematic)

Or does it really matter There were no instructions enclosed with the SSR's..
Attached Thumbnails
wiring-schematic-help-wiring-2-ssr.jpg  
Reply With Quote
  #2 (permalink)  
Old 09-06-2008, 11:14 PM
Amateur Metal Finisher
 
Join Date: Jul 2008
Posts: 104
SCOTTRODS is on a distinguished road
Default Re: Wiring schematic - help

Looks pretty cut and dried to me. Show SSR's maybe, so we can see what you're seeing? I'd expect the SSR's to have their own schematic so you'd know what to wire up.

From the drawing shown, Yes, an L1 is important. nIf you trace the flow from L1 you'll see how there has to be one to form the circuit....

Welcome to basic electricity, please have a seat in a chair close to the front of the class...... (Just funnin' a little....)

I'm sure the teacher/s will be along shortly.
Reply With Quote
  #3 (permalink)  
Old 09-07-2008, 11:58 AM
Experienced Metal Finisher
 
Join Date: Jul 2006
Posts: 286
ed_denu is on a distinguished road
Default Re: Wiring schematic - help

The ability of a PID to drive multiple ssr's is based on the load characteristics of the PID and SSR's being used. The PID outputs driving the SSR(s) will have a maximum load rating. In the case of my PID it's 40ma. So as long as the SSR input current requirements combined do not exceed 40ma then it could handle 2 ssrs.

As for the L1 I'm not real sure what the question is. The SSR is just a relay(switch) capable of supporting much higher loads then the PID itself could manage. The T1 in this case is the supply side of the SSR output. The L1 is the load side going to the elements. Without the L1 connection the elements would never be energized.

The SSR should have come with details of it's input voltage requirements and load carrying capabilities. As for wiring the SSR there aren't many options. The (2) input terminals accept voltage from the controller or PID(usually polarity sensitive) and the (2) load side terminals get (1) connected to the source and (1) connected to the load(elements).

Last edited by ed_denu; 09-07-2008 at 12:10 PM.
Reply With Quote
  #4 (permalink)  
Old 09-07-2008, 01:44 PM
Newbie
 
Join Date: Aug 2008
Posts: 7
justshapes is on a distinguished road
Default Re: Wiring schematic - help

Just so everyone is up to date on this, following is the reply and the message that I sent to Suyi Liu at Auber Instruments

- Show quoted text -
On Sat, Sep 6, 2008 at 9:05 PM, Michael McCoy <JustShapes@verizon.net> wrote:

Dear: Suyi,

Please review the attached wiring schematic and advise...

Per our conversation prior to my purchase last week, you told me that the Model SYL-4352 PID could activate two SSR's.

I have questions as to the line input to the SSR. Is the L1 a required line input

Or does it really matter There were no instructions enclosed.

You are the expert...

Our plan is to have two 12' ovens with two PID's, each. One for the front area and another for the rear of the ovens, both ends using the same basic wiring schematic as attached.

Your suggestions and expertise would be gratefully appreciated and please discard the previous email message...

Thanks,

Mike


Hello Mike,
There is no diffrence between the L1 and T1 of the SSR.
The schematic is fine. However, The fuse design is not correct. If you want protect the controller, a 0.5 A fuse should be used. The 15 A fuse should be installed to the heater loop.
Best Regards,
Suyi


--
Suyi Liu
Auber Instruments
auberins.com, Your number one source for precision instruments
Reply With Quote
Reply

Bookmarks


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Similar Threads
Thread Thread Starter Forum Replies Last Post
my schematic cessna182 Oven Building Forum 1 07-18-2008 08:28 PM
My oven SCHEMATIC...for new oven builders.. RNMHRD Oven Building Forum 39 05-09-2007 06:18 PM
Another Schematic usmcmaw Oven Building Forum 0 10-30-2006 12:23 AM
Wiring help now??? Evolved Oven Building Forum 5 07-06-2006 10:14 PM
FiberGeek.....I need help with your VCCS schematic wildman Anodizing Questions 2 12-19-2003 08:19 PM


All times are GMT -4. The time now is 06:20 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0
Copyright © Caswell Inc.